Chairs Molds

Brand :Focare Mould

Product origin :China

Delivery time :60 working days after confirming the design

Supply capacity :500 sets of molds per year

The important points which we care about when we make chair molds:
1) We add as many cooling system as possible including the chair surface to ensure outstanding cooling performance.
2) We add wear plates with HRC 45 above to guarantee the chair molds’ life.
3) We use steel with HRC 30~33.
4) We use high speed CNC machine to reach 0.02 mm precision.
Focare Mould has experiences in gas assistant chair molds, rattan chair molds, arm and armless chair molds, foldable chair molds, baby chair molds, etc. Please contact with us if you need more information.

Focare Mould has focus on injection mold making for years, we have experienced design group to make product and mold design.  Our design group is devoted to optimize each design in order to let the molds have excellent performance with good cooling system and easy for maintenance.  Focare Mould also attaches importance to high quality mold steel which is guarantee of mold life and standard spare parts.

Focare Mould has fifteen CNC machines, ten EDM machines, two 250T injection molding machines, one 280T two color injection machine and one 350T two color injection machine for mold testing in our own factory.  

280T01.jpg

280T FCS Rotary Table Two-Component Injection Molding Machine 


_H7B5861(1).jpg CNC.jpg 

350T BESTONTECH Rotary Axis Two-Component Injection Molding Machine

CNC.jpg

CNC machines


molds01.jpg

Molds ready for shipping


How we work?

(1)Customers send us, samples, drawings or pictures for quotation.

(2)Focare Mould sends quotation to customers.

(3)If customers agree with the quotation, make the payment for deposit and send us Bank receipt.

(4)Focare Mould starts the product design after receiving the deposit.

(5)Focare Mould starts the mold design after customers confirm the product design.

(6)Focare Mould starts fabricating the molds after customers confirm the mold design.

(7)Focare Mould offers the production schedule to customers weekly.

(8)Focare Mould tests the molds after finishing them, and send samples to customers.

(9)Focare Mould prepares shipping the molds after customers confirm the test samples.

(10)Focare Mould ships the molds after receiving the final payment.


Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
* Subject :
* Email :
  • Name :

  • Phone:

Message :